Sign language dictionary FYP
Saturday, 20 September 2014
App skeleton
Skeleton of necessary activities made (as detailed in flowchart in Requirements Analysis)
Buttons in the correct place and navigate to the correct activity
Code: 140920 ActivityFlow
Monday, 15 September 2014
Requirements analysis, v1.3
Database requirements added
Extra Capture screen added to flow diagram
Awaiting final checks.
v1.3
Sunday, 14 September 2014
Requirements analysis, v1.2
Mobile app requirements fleshed out
Flow diagram added
v1.2
Tuesday, 2 September 2014
Requirements analysis mockup, v1.0
Introduction section mostly drawn up; still feeling through specific requirements for each stage of project.
v1.0